Ticket #1631 (s2c_design_ok unplanned_task) — at Version 14

Opened 16 years ago

Last modified 15 years ago

GROUP_PDF_R0

Reported by: pav Owned by: pav
Priority: major Milestone: M05_PRE5
Component: ALIEN_ELEMENTS Version: 2.0
Keywords: Cc:
Category: EXTRA Effort:
Importance: Ticket_group:
Estimated Number of Hours: Add Hours to Ticket:
Billable?: Total Hours:
Analysis_owners: pav Design_owners: pav
Imp._owners: Test_owners:
Analysis_reviewers: boyan Changelog:
Design_reviewers: boyan Imp._reviewers:
Test_reviewers: Analysis_score: 4
Design_score: 4 Imp._score: 3.5
Test_score: 0

Change History

comment:1 Changed 16 years ago by pav

  • Owner set to pav
  • Analysis_owners pav deleted

comment:2 Changed 16 years ago by pav

  • Description modified (diff)

comment:3 Changed 16 years ago by pav

  • Status changed from new to s1a_analysis_started
  • Analysis_owners set to pav

comment:4 Changed 16 years ago by pav

  • Status changed from s1a_analysis_started to s1b_analysis_finished

3h

comment:5 Changed 16 years ago by boyan

  • Status changed from s1b_analysis_finished to new
  • Analysis_reviewers set to boyan
  • Analysis_score changed from 0 to 2
  • The PDF_SELECT_R0 task should be added to the group and rescheduled for the current iteration OR it should be noted that copy/paste functionality is not part of this group of tasks. The same applies to PDF_EXTRACT_R0
  • It should be noted that PDF exporting is not part of this group of tasks (it is related to formats).
  • Considering the above two, it is good to have an overview of what PDF functionality we will have but you should clearly state what part of it will be achieved in this group of tasks.As a whole, make sure you have consistency between the overview and the task requirements - currently the importing of PDF page content is not mentioned at all in the requirements.
  • The existing wiki pages of the tasks in the group might be added to the Related section. Otherwise you have to go through the ticket before you see the page.

(reviewed in 30m)

comment:6 Changed 16 years ago by pav

  • Status changed from new to s1a_analysis_started

comment:7 Changed 16 years ago by pav

  • Status changed from s1a_analysis_started to s1b_analysis_finished

I don't think it is good idea to add more tasks in this group. Added clear sentence that not all of the overview things is going to be required(as it is normal). I think reading the requirements will clear enough what is not part of the required things. The existing wiki pages are not full and clear so they are not good example to be related.

comment:8 Changed 16 years ago by boyan

  • Status changed from s1b_analysis_finished to s1c_analysis_ok
  • Analysis_score changed from 2 to 4

Arguments taken. The analysis is good. (10m)

comment:9 Changed 16 years ago by meddle

  • Ticket_group set to GROUP_RESOURCE_R0

comment:10 Changed 16 years ago by meddle

  • Ticket_group GROUP_RESOURCE_R0 deleted

comment:11 Changed 16 years ago by pav

  • Design_owners set to pav
  • Status changed from s1c_analysis_ok to s2a_design_started

comment:12 Changed 16 years ago by pav

  • Status changed from s2a_design_started to s2b_design_finished

2d

comment:13 Changed 16 years ago by boyan

  • Status changed from s2b_design_finished to s2c_design_ok
  • Design_score changed from 0 to 4
  • Design_reviewers set to boyan

The design is good enough and reflects correctly what should be done at this iteration.

comment:14 Changed 16 years ago by boyan

  • Description modified (diff)

addding status to the description