Changes between Version 23 and Version 24 of INTERNAL_BACKLOG_STRUCTURE_R0


Ignore:
Timestamp:
10/01/08 17:08:54 (17 years ago)
Author:
pacitu
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • INTERNAL_BACKLOG_STRUCTURE_R0

    v23 v24  
    2828 
    2929= Implementation = 
    30 A Google Doc has been created, containing the sections described in the [#Design Design] section.[[BR]] 
    31 See [http://spreadsheets.google.com/ccc?key=p-0Oq38E1ayuX-E_kPfPxbg&hl=en# Internal Backlog Google Doc][[BR]] 
     30 * A Google Doc has been created, containing the sheets described in the [#Design Design] section.[[BR]] 
     31  * Impediments sheet with: 
     32   * Name - name of the impediment 
     33   * Description - short description of the impediment 
     34   * Date - the date it was posted 
     35   * Submitter 
     36   * Impact - low, medium, strong, etc. 
     37   * Status - resolved, unresolved, etc. 
     38  * Smells sheet with: 
     39   * Name - name of the smell. 
     40   * Location - class, package, document, etc. 
     41   * Description - a short description.  
     42   * Reported - a date. 
     43  * Documents sheet with: 
     44   * Name 
     45   * Link 
     46  * Daily Availability - everyone should fill the days he can be available for the current sprint. 
     47  * Global Availability sheets 
     48   * Week        
     49   * Notes 
     50 * See [http://spreadsheets.google.com/ccc?key=p-0Oq38E1ayuX-E_kPfPxbg&hl=en# Internal Backlog Google Doc][[BR]] 
    3251 
    3352= Testing =