Last modified 15 years ago
Last modified on 09/30/08 12:27:50
- Analyzing : Pavlina, Todor(done: 20 mins)
- Refactoring: Deyan (done: 5 mins)
- Analysis Review: 3 - OK - Peko (5 mins)
- Designing : Pavlina (done: 30 mins)
- Design Review: 3 - OK - Peko (5 mins)
- Implementing : Pavlina
- Implementation Review: 4 - OK - Peko (55 mins)
- Super Review: milo - 2 - The whole structure needs to be reviewed, lots of things are not for here (should be placed in other places)!
- Implementing 2: Peko - done - 5m - Some things removed from PROCESS(they already existed in PLATFORM_STANDARDS_CODE_R0)
- Review: 3.5 by todor. Added links for some docs that weren't ready when this task was in implementation phase. Things that weren't for here are already removed.
- Testing :