* Analyzing : Pavlina, Todor(done: 20 mins)[[BR]] * Refactoring: Deyan (done: 5 mins) * Analysis Review: 3 - OK - Peko (5 mins) * Designing : Pavlina (done: 30 mins)[[BR]] * Design Review: 3 - OK - Peko (5 mins) * Implementing : Pavlina[[BR]] * Implementation Review: 4 - OK - Peko (55 mins) * Super Review: milo - 2 - The whole structure needs to be reviewed, lots of things are not for here (should be placed in other places)! * Implementing 2: Peko - done - 5m - Some things removed from PROCESS(they already existed in PLATFORM_STANDARDS_CODE_R0) * Review: 3.5 by todor. Added links for some docs that weren't ready when this task was in implementation phase. Things that weren't for here are already removed. * Testing :[[BR]]