1 | | Verify the existing dependencies in work breakdown structure document(make automatic script to check if the revisions are correct in the related tasks).[[BR]] |
2 | | Add more dependencies for base tasks.[[BR]] |
3 | | |
4 | | Check manually if the created schedule is possible(this can be done by the generated exports or task juggler calendars).[[BR]] |
| 1 | * Verify the existing dependencies in work breakdown structure document(make automatic script to check if the revisions are correct in the related tasks).[[BR]] |
| 2 | * Add more dependencies for base tasks.[[BR]] |
| 3 | * Check manually if the created schedule is possible(this can be done by the generated exports or task juggler calendars).[[BR]] |