    2727Overall during this iteration we've established some fundamental standard about the work processes and created templates for how tasks must be executed. Most of our work was concentrated on writing documents and templates that will ease our work in the future, although we've made a lot of changes and that cost us a lot of time in refactoring already finished tasks according to the new templates, now we've have a firm base that we'll use in the future. 
    2828 
     29Our goal for the next sprint is to increase productivity, so that we can do everything in time. For the second iteration we have 61 planned + 3 unplanned (left from the previous sprint). These should be done until 2008-10-31. 
     30We've also took some decisions on how to improve: 
     31* Focus time - from :15 to :00 of each hour is time to focus. During it no distractions are allowed. If it is really important to communicate with someone, the communication should be done in a way that does not affect the others. 
     32* Task ordering - as part of SCHEDULE_MAINTAINANCE task, the tasks should be ordered in appropriate way. 
     33* Maintainance tasks should be done first (and not last). 
     34* As part of WIKI_SETUP someone should ensure that everything is up after a power failure. 
     35* In order people to have better idea what each task is about, we should describe each planned task briefly in the beginning of the sprint. The results of these are in m02-descriptions-bg.txt and m02-descriptions-en.txt 
     36* We decided to have a weekly meetings, every monday at 10:00. They should not be long, so everyone has to be on time. The weeklies consists of a short report of everyone, on "What were you doing the last week", "What will you do the next week", "Impediments", followed by a tech presentation (of a library, technology, tool, etc.) or a design discussions. Everything should be no longer than 1 hour. 
     37 
     38I hope this mail will satisfy your interest in the project and its current status, now it is time to work so you can read such mail as soon as possible. 
     39 
    2940= Implementation = 