Changes between Initial Version and Version 1 of SCS_PROJECT_BLOG_R1


Ignore:
Timestamp:
10/07/08 16:45:15 (16 years ago)
Author:
todor
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SCS_PROJECT_BLOG_R1

    v1 v1  
     1[[BackLinksMenu]] 
     2 
     3= Analysis = 
     4== Overview == 
     5We will use a Blog to communicate with the users as well as a forum and mail groups. In the Blog we'll describe what is happening with the project - current status, sprint overviews, used technologies, obstacles (imprediments). 
     6== Task requirements == 
     7For this revision of the task we must: 
     8 * Write a post about our progress during the last iteration 
     9 * Write a post with common information (something interesting about the team or the process of development of Sophie 2.0) 
     10== Task result == 
     11The result of this task must be at least two posts in the project's blog. 
     12== Implementation idea == 
     13One post about the results of [wiki:ITERATION_01] and one post with interesting news about team members or developing process should be enough. 
     14== Related == 
     15[wiki:SCS_PROJECT_BLOG_R0] 
     16== How to demo == 
     17Show the blog and the new posts. 
     18 
     19= Design = 
     20 
     21= Implementation = 
     22^(Implementation results should be described and linked here (from the wiki or the repository)^ 
     23 
     24= Testing = 
     25 
     26= Comments = 
     27 
     28= Log = 
     29^(Link the log of the task here)^ 
     30