  • SCS_PROJECT_BLOG_R1

    v18 v19  
    3131 * Task ordering - as part of [wiki:SCHEDULE_MAINTENANCE_R1] task, the tasks should be ordered in appropriate way. 
    3232 * Maintenance tasks should be done first (and not last). 
    33  * As part of [wiki:SCS_WIKI_SETUP_R1] someone should ensure that everything is up after a power failure. 
     33 * As part of [wiki:SCS_WIKI_SETUP_R0] someone should ensure that everything is up after a power failure. 
    3434 * In order for people to have better idea what each task is about, we should describe each planned task briefly in the beginning of the sprint. The results of these are in [source:manage/reports/m02/0m02-descriptions-bg.txt] and [source:manage/reports/m02/0m02-descriptions-bg.txt] 
    3535 * We decided to have a weekly meetings, every monday at 10:00(EEST). They should not be long, so everyone has to be on time. The weeklies consists of a short report of everyone, on "What were you doing the last week", "What will you do the next week", "Impediments", followed by a tech presentation (of a library, technology, tool, etc.) or a design discussions. Everything should be no longer than 1 hour.