Changes between Version 7 and Version 8 of SCS_WIKI_MAINTENANCE_R0_LOG


Ignore:
Timestamp:
10/01/08 16:17:15 (17 years ago)
Author:
pacitu
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SCS_WIKI_MAINTENANCE_R0_LOG

    v7 v8  
    1  * Analyzing : Pacitu - done - 25min[[BR]] 
     1 * Analyzing : Pacitu ( done 25m )[[BR]] 
    22  * Review: 2 by Tanya - The analysis doesn't apply to the template. For example the part "How to demo" is missing. 
    3   * Analysis refactor: Deyan (done : 15 minutes) 
    4  * Designing : Pacitu 
     3  * Analyzing 2: Deyan (done 15m) 
     4 * Designing : Pacitu (done 15m) 
    55  * Review: 4 by Tanya - OK 
    6  * Implementing : Peko - 50m[[BR]] 
    7   * Review: 2 by Deyan (done : 2 minutes) - Implementation is done, but there is nothing in Implementation section. 
    8  * Implementing 2: Deyan (done : 50 minutes) 
    9  * Implementing 3: Deyan (done : 1.5h) General review of all tasks, corrected implementation section and other fixes. See http://10.10.117.11:8000/sophie2/wiki/ITERATION_01?version=170 , bottom of the document. 
     6 * Implementing : Peko (done 50m)[[BR]] 
     7  * Review: 2 by Deyan (done  2m) - Implementation is done, but there is nothing in Implementation section. 
     8 * Implementing 2: Deyan (done 50m) 
     9 * Implementing 3: Deyan (done 1.5h) General review of all tasks, corrected implementation section and other fixes. See http://10.10.117.11:8000/sophie2/wiki/ITERATION_01?version=170 , bottom of the document. 
    1010  * Review: 4 by todor. All sections of the task are clear. All that had to be done is done. 
    1111 * Testing :[[BR]]