wiki:BASE_BOUND_CONTROLS_R0_LOG

Version 11 (modified by peko, 17 years ago) (diff)

--

  • Analyzing : Pap - done (35 min)
    • Review: 2 by Tanya - 10min. It is incorrect. The analysis must cover what should be done only through the current revision. This analysis is for the whole task.
  • Analyzing 2: Peko - done (30 mins)
    • Review: 3.5 by Tanya -10m
  • Designing : Peko - 3.5h - done.
  • Implementing : Peko 3.5h
  • Implementing 2 : Peko 4h - done.
  • Testing :