Version 4 (modified by Tanya, 17 years ago) (diff) |
---|
Analysis
Overview
Global specification is detailed description of the product and its features.
Task requirements
In order to make the document understandable and useful you must follow these rules:
- Keep documentation:
- and other artifacts in such ways that they are as easy as possible to manage
- up to date
- synchronized with work breakdown structure
- with simple structure
- Check regularly for incorrectly specified components.
- Analyze what have to be added and what have to be described more precisely.
Requirements to the task result
The result of this task must be report.
Related
How to demo
Present the report.
Design
Implementation
Testing
Log
- Analyzing : Pavlina, Todor(done: 25 mins)
- Analysis Review: 3 - ok Peko (5 mins)
- Designing : todor
- Design Review: 3 - ok Peko (5 mins)
- Implementing : todor
- Implementation Review: 2 - Peko (5 mins) - cannot be ready till the end of the sprint. All artifacts should be thoroughly reviewed.
- Implementing2: todor. Some minor fixes in sophie 2 gui table and SRS. Thoroughly review of all current documents.
- Implementation Review: 3 - Deyan (25 mins)
- Testing :