Version 9 (modified by milo, 17 years ago) (diff) |
---|
- Analyzing : Pavlina, Todor(done: 20 mins)
- Refactoring: Deyan (done: 5 mins)
- Analysis Review: 3 - OK - Peko (5 mins)
- Designing : Pavlina (done: 30 mins)
- Design Review: 3 - OK - Peko (5 mins)
- Implementing : Pavlina
- Implementation Review: 4 - OK - Peko (55 mins)
- Super Review: milo - 2 - The whole structure needs to be reviewed, lots of things are not for here (should be placed in other places)!
- Testing :