Last modified 16 years ago
Last modified on 11/07/08 13:58:13
Analyzing: Deyan (done : 35 min)
Review: 3.5 by todor. The analysis is good enough and gives all needed information what should be done in this revision. But didn't mention when the backup should be done. The LOG wasn't included, be more careful.
Design: deyan (done:10m)
Review: 3 by Pav. Added to the design that the current CD must be reviewed.
Implementation: Peko, Deyan 10m (done)
Testing:
Comments: