There are no new posts in the maillist for the previous two iterations. So we must create at least one post containing information about our progress during the eighth and ninth iterations.
Task requirements
Create post for the previous iterations which contains:
- Information from the retrospections
- What went well
- What could be better
- How to improve
- Mention the team building during the eighth iteration and the discussions that were done
- Demonstration
- add link to the video
- brief explanation what was demonstrated
- Demonstration
Task result
The result of this task must be a mail sent to the maillist.
Implementation idea
- Use the .mm files to collect information about the retrospections and etc. Complete this task in parallel with SCS_PROJECT_BLOG_R7.
- Create sample content in the design phase and send it to Nick and Ludmil for recommendations.
- Send the approved content during the implementation.
Related
How to demo
Show the mail.
Design
Sample content of the post for the mail list. It was sent to Nick and Ludmil for recommendations
ITERATION_08 and ITERATION_09 Summaries Today's report covers our last two Iterations. The team has been very busy and very productive. During these Iterations, the team achieved many of its goals and drastically advanced Sophie 2 capabilities. We released Alpha 3, available for download at http://www.sophie2.org/users/downloads.html, and we are now looking forward to our first beta version, scheduled for the 14th of August. The new user interface will be included in this release. We have posted two demo books, which can be found at: http://sophie2.org/trac/wiki/ITERATION_10/Release/UserDocumentation/DemoBooks and updated the user tutorials, available at: http://sophie2.org/trac/wiki/ITERATION_10/Release/UserDocumentation/AnIntroductionToSophie During the eighth Iteration, the team held a very productive two day seminar at Panichishte, clarifying design ideas and planning integration. Several new developers joined the team during this period. A significant event during the ninth Iteration was a demonstration of the Sophie 2 Alpha 2 release on the 2nd of July. Two videos of the demonstration are available at: http://asteasolutions.net/videos/2009-07-02%20Demo-VNC.avi and http://asteasolutions.net/videos/2009-07-02%20Demo.avi . Below are the results of our most recent retrospections. ITERATION_08 retrospection: What went well: * More tasks finished * Successful demo * Process Improvements * Release quality What could be better: * Weekly time boxing * Defining scope * Meeting weekly milestones How to improve: * Increase number of analysis discussions * Work more carefully * Stay on plan * Intensify testing ITERATION_09 retrospection: What went well: * Internal team communication * Issuing bug tickets * Working on the Sophie 2 Server again * New team members What could be better: * Availability of the team members * Time management * Submitted quality * Integration speed How to improve: * Move declaration of tasks to Monday * Additional integrators * Pick smaller tasks * Increase effort on bug fixes Best regards, The Sophie Team.
Implementation
(Describe and link the implementation results here (from the wiki or the repository).)
Testing
(Place the testing results here.)
Comments
(Write comments for this or later revisions here.)