wiki:SCS_TEST_TRACKING_MAINTENANCE_R1_LOG

Version 17 (modified by todor, 16 years ago) (diff)

--

Analysis: deyan (done:45m)
Review: 3.5 by Pav (done:10m)
Design: deyan (done:5m)
Review: 3 by Pav(done:10m) It has to be more detailed. Use bullets for better reading.
Implementation: deyan (done)
Review: 2 by todor. The structure of design does not satisfy the requirements for design, copy part of the implementation ideas there if it is necessary. In the implementation part of the task there is no link to the result of this task, which makes its reviewing hard. One of the task requirements (mail to the dev group) is not fulfilled.
Testing:
Comments: