Analysis
Overview
Test tracking maintenance is used to determine which tasks of previous iteration should be tested manually.
Task requirements
- Open ITERATION_03 and determine which tasks should be tested.
- All tasks of the main team may be included. These can be seen better at ITERATION_03/AnalysisTeam as tasks are categorized.
- Create a test plan with all of the tasks that are related to the Release schedule. These tests should be run regularly.
- Define in what interval these tasks should be tested.
- Do a backup somewhere (using export for all of the test cases; you may upload the xml here too)
- Review existing test cases
- Remove older versions where needed (older versions you decide obsolete. Note that in some cases older versions can contain useful information.)
- Currently, there are empty test cases suggested for manual testing at previous revisions of this task. If you find them non testable, remove them from the test tracking system.
Task result
Tasks chosen for manual testing. Cleared Test Link. Detailed information on what is done.
Implementation idea
Reviewing how to demo of the tasks would help choosing tasks for manual testing as there are some tasks that offer almost ready test cases in this section.
Related
SCS_TEST_TRACKING_MAINTENANCE_R2
SCS_TEST_TRACKING_MAINTENANCE_R1
SCS_TEST_TRACKING_MAINTENANCE_R0
http://sophie2.org/testlink
How to demo
Show the list of chosen tasks.
Design
(Describe your design here.)
Implementation
(Describe and link the implementation results here (from the wiki or the repository).)
Testing
(Place the testing results here.)
Comments
(Write comments for this or later revisions here.)