wiki:SCHEDULE_MAINTENANCE_R1

Version 4 (modified by deyan, 17 years ago) (diff)

--

Error: Macro BackLinksMenu(None) failed
compressed data is corrupt

Analysis

(The purpose of the analysis is to give as much as possible of the needed information for designing and implementing the task.)

Overview

Input the three unplanned tasks. Arrange the reports and specificate their situation. Fix dates of the milestones. Structure to write a final report.

Task requirements

The sub-tasks for this revision are:

Consider how to add them - by adding new revisions to the wbs or editing the page. Note that changing revisions will probably cause more issues.

  • Design a structure for iteration reports.
  • Arrange the reports. Create a folder for each iteration (may be done later for more convenient work - folder for the current iteration may be done at the beginning of it.)
  • Review current dates of the milestones. See the start date of Iteration2 and current Iteration Calendar. Recheck the milestone length, calculate new

dates. Fix the date in manage/sched/Sprints.txt. Consider renaming Sprints.txt -> sprints.txt.

Task result

A wiki page.

Implementation idea

Create Reports? with report requirements. Include requirements for daily (See manage/reports/0README.txt and iteration reports. Point the way to check if the report has "bad lines".

(Here you can add related tasks that could be useful or helpful.)

How to demo

(In this section you must add instructions for the demo of the task.)

Design

Implementation

(Implementation results should be described and linked here (from the wiki or the repository)

Testing

Comments

Log

(Link the log of the task here)