Version 12 (modified by todor, 16 years ago) (diff) |
---|
Analysis
Overview
We will use a Blog to communicate with the users as well as a forum and mail groups. In the Blog we'll describe what is happening with the project - current status, sprint overviews, used technologies, obstacles (imprediments).
Task requirements
For this revision of the task we must:
- Write a post about our progress during the last iteration
- (optional) Write a post with common information (something interesting about the team or the process of development of Sophie 2.0)
Task result
The result of this task must be at least two posts in the project's blog.
Implementation idea
One post about the results of ITERATION_01 and one post with interesting news about team members or developing process should be enough.
Related
How to demo
Show the blog and the new posts.
Design
The post for the blog about the project status will be the same as the mail sent to sophie2-devs mailgroup with some minor changes:
Hello to all who are interested in the Sophie 2.0 development process, with the end of our first iteration comes our first post in the blog about the current status of the project.
Like some of you may know we've managed to complete almost all tasks of ITERATION_01, and now we're looking forward to beginning our next iteration. As a fully open source project the information about the progress of Sophie 2.0 is publicly available at http://asteasolutions.net:7080/sophie2/wiki/SCS_SITE_DESIGN/DevelopmentHome where you can find more detailed information about the tasks we're working on and their state.
As a whole during this iteration we've established some fundamental standard about the work processes and created templates for task completion howtos. Most of our work was concentrated on writing documents and templates that will ease our work in the future. Although we've made a lot of changes on them and that cost us a lot of time in refactoring already finished tasks according to the new templates. Now we have a firm base that we'll use in the future.
Our goal for the next sprint is to increase productivity, so that we can do everything on time. For the second iteration we have 61 planned tasks + 3 unplanned tasks (left from the previous sprint). These should be done until 2008-10-31. We've also took some decisions on how to improve:
- Focus time - from :15 to :00 of each hour is time to focus. No distractions are allowed during focus-time. If it is really important to communicate with someone, the communication should be done in a way that does not affect the others.
- Task ordering - as part of SCHEDULE_MAINTAINANCE task, the tasks should be ordered in appropriate way.
- Maintainance tasks should be done first (and not last).
- As part of WIKI_SETUP someone should ensure that everything is up after a power failure.
- In order for people to have better idea what each task is about, we should describe each planned task briefly in the beginning of the sprint. The results of these are in m02-descriptions-bg.txt and m02-descriptions-en.txt
- We decided to have a weekly meetings, every monday at 10:00(EEST). They should not be long, so everyone has to be on time. The weeklies consists of a short report of everyone, on "What were you doing the last week", "What will you do the next week", "Impediments", followed by a tech presentation (of a library, technology, tool, etc.) or a design discussions. Everything should be no longer than 1 hour.
In future we will follow the tradition to inform you for our progress at the end of each iteration.
The next post for this iteration will be postponed a little.
Implementation
The result of this task is the last post of the Blog.
Testing
Comments
Log